Current Construction Projects:

  1. Finish Drywall/sand/paint and install trim to office Door
  2. Kids tree-house base/floor
  3. Main bedroom bath exhaust fan install
  4. Kitchen Range exhaust fan/vent install
  5. Build out fire walls for server room
  6. Finish Fiber pull to server rack and Terminate *new since now I remember I still need to do this too

Current hardware projects:

  1. Kids custom 3d printed TLK keyboards
  2. Micro cluster rack mount design
  3. Micro cluster storage solution
  4. De-com old server, ship to Xydros
  5. Move racks to server room
  6. Rebuild rack layout
  7. Add UPS to wireless/nvr/camera equipment

Software Projects:

  1. OPNsense/PFsense update
  2. Pihole for DNS
  3. Degoogle storage
  4. Degoogle photos
  5. Degoogle calendar
  6. 3-2-1 bakup solution
  • jgrim of SublinksA
    link
    fedilink
    arrow-up
    1
    ·
    1 year ago

    How did you get a server room and where are you moving it from RE: Move racks to server room Rebuild rack layout

    • infinitevalenceOP
      link
      fedilink
      English
      arrow-up
      2
      ·
      1 year ago

      So I already have a rack in my garage/basement but I want to build physical fire walls around it so if anything catches on fire, or if my UPS goes it wont take my whole house with me.

      I also need walls for dust and temperature control since as it is now if its hot in the garage its hot in my servers.

      Currently I have this full sized 44u and then a smaller wall mount mount that I would like protected.

      So at the moment, I dont really have a server room, but when I am done I will, It will have dedicated 30a 240v, 4h rated firewalls, with rockwool insulation for sound dampening, and filtered air conditioned air. It will also have a lock so my kids cant mess with it.