• threelonmusketeers@sh.itjust.worksOPM
    link
    fedilink
    English
    arrow-up
    8
    arrow-down
    1
    ·
    16 days ago

    Hopefully that day comes soon!

    We probably won’t see payloads fly on Starship until they demonstrate in-space Raptor relight capability. After that, I wouldn’t be surprised if they prioritize ship-to-ship propellant transfer tests over delivering payloads.

    What do you think the timeline will be?

    As for returning the ship, S30 did better than S29, landed on target, but still experienced a bit of flap burnthrough. I’m looking forward to seeing how S33 fares with the new flap location.

    • MartianSands@sh.itjust.works
      link
      fedilink
      English
      arrow-up
      4
      ·
      16 days ago

      I’ll bet they deploy a bunch of starlink satellites basically as soon as they’re able, if only for PR (and probably internal morale) reasons

    • sp3ctr4l@lemmy.zip
      link
      fedilink
      English
      arrow-up
      4
      arrow-down
      1
      ·
      edit-2
      16 days ago

      Timeline for StarShip delivering a payload of at least 25 tons to orbit and returning from orbit intact, as in, it can be repaired in one to two months and then reflown again?

      6 to 8 years, assuming Trump and Elon win the election and Elon just gets to throw infinite taxpayer money at SpaceX via NASA. And it won’t be called StarShip, Elon will change its name a few times.

      If Trump and Elon lose, probably never, Elon will end up in jail and/or have to greatly downsize SpaceX after NASA stops funding StarShip.

      EDIT: You mention orbital fuel transfers.

      AFAIK, that hasn’t been even designed, at all.

      All we’ve seen are 3D renders.

      Oh sure lets mate the fuel booms together at the engines, and then… slosh… the fuel… into the other craft?

      Wait, that’s a really bad idea? For an astounding number of reasons?

      Oh uh, just connect them side to side, sure.

      Oh… ok…

      Have any actual details of this been explained?

      Would that require crew in EVA suits? A fully automatic docking system and fuel connection system?

      • Tar_Alcaran@sh.itjust.works
        link
        fedilink
        English
        arrow-up
        2
        ·
        14 days ago

        EDIT: You mention orbital fuel transfers. AFAIK, that hasn’t been even designed, at all.

        They did an in-craft fuel transfer during their last test. While it’s certainly complex to pump fuel around without gravity, that’s only the small first step in actually transferring fuel. Making a connection in orbit that’s capable of fully refueling an entirely seperate craft is an order of magnitude harder.

        • threelonmusketeers@sh.itjust.worksOPM
          link
          fedilink
          English
          arrow-up
          1
          ·
          14 days ago

          Making a connection in orbit that’s capable of fully refueling an entirely seperate craft is an order of magnitude harder.

          They do have some experience in this area though. Dragon can autonomously dock to the ISS.

          • Tar_Alcaran@sh.itjust.works
            link
            fedilink
            English
            arrow-up
            2
            ·
            14 days ago

            Yeah, they could just slap an PMA+IDA port on Starship like the ISS has, but that’s just a hole with data and power ports. Those are pretty easy compared to fuel transfer, and they’re specifically NOT suited to lateral forces. It also seems a bit unfit-for-purpose to make a big and heavy crew-transfer dock when you don’t have to.

            • threelonmusketeers@sh.itjust.worksOPM
              link
              fedilink
              English
              arrow-up
              1
              ·
              11 days ago

              True, an IDA port is not well suited for fuel transfer. I was thinking more of the GNC software experience SpaceX have for rendezvous and docking in general. I suspect the ports themselves will look more like the ship and booster quick disconnects we see at the launch site.