Polish train manufacturer that lost servicing tender programmed train controller to brick itself after train stays for some time in 6 ISP facilities or in 1 their faculity(for testing?) until undocumented button combination is pressed. Some controller versions brick itself after train is idle for 10 days. After news about this became public, manufacturer removed ability to unlock train by button combination.

Also manufacturer is able to remotely brick train over internet(connected via GSM) at any time.

Mod wanted ONLY article, so enjoy reading in polish.

  • uis@lemmy.worldOP
    link
    fedilink
    English
    arrow-up
    40
    ·
    1 year ago

    No idea. Original post was deleted because “not an article”. I can’t even see old version to not go through a pain of typing post body again.