• absGeekNZ@lemmy.nzOP
    link
    fedilink
    English
    arrow-up
    5
    ·
    3 days ago

    I am impressed with the stated specs, I’ll be more impressed if it can do what it claims.

    ~730kWh is a lot of stored energy.

    • TagMeInSkipIGotThis@lemmy.nz
      link
      fedilink
      arrow-up
      2
      ·
      2 days ago

      For sure - I guess in an ideal world they’d be used for shorter runs between production / delivery nodes. Eg Factory -> Warehouse, Warehouse -> Railhead / Port. There’s a bit of downtime as trucks get loaded & unloaded so in an integrated system you could charge at the stops as well I suppose.