• Ilovethebomb@lemm.ee
    link
    fedilink
    arrow-up
    4
    ·
    3 days ago

    It’s quite impressive, but time will tell of course how well it works under commercial conditions. The idea of doubling up CCS chargers has been done before, too. The Wellington harbour ferry does the same thing.

    • absGeekNZ@lemmy.nzOP
      link
      fedilink
      English
      arrow-up
      5
      ·
      3 days ago

      I am impressed with the stated specs, I’ll be more impressed if it can do what it claims.

      ~730kWh is a lot of stored energy.

      • TagMeInSkipIGotThis@lemmy.nz
        link
        fedilink
        arrow-up
        2
        ·
        2 days ago

        For sure - I guess in an ideal world they’d be used for shorter runs between production / delivery nodes. Eg Factory -> Warehouse, Warehouse -> Railhead / Port. There’s a bit of downtime as trucks get loaded & unloaded so in an integrated system you could charge at the stops as well I suppose.